262.377.7302  •  W53 N594 Highland Drive  •  Cedarburg, WI  •  53012

Project type:

New Construction

Status:

In Progress - Conceptual

The Wisconsin Avenue Building

Grafton, WI

Projects

Located on the most prominent site in downtown Grafton, the Wisconsin Avenue building is planned to replace the Grafton Hotel.  The design is composed of 2 parts - each representing a part of Grafton.  The main street façade element is meant to look industrial, much like the hard-working people of Grafton.  The second part is to be somewhat reminiscent of the hotel.  Contained within the building is a first floor restaurant, second floor banquet room, and third and fourth floor offices.